London Aquatics Centre by Zaha Hadid Architects | A New London Award 2014 Winner

th_65d1300db123ce22f6e2569fb36764f8_zha_aquaticscentre_huftoncrow_017

New London Award 2014: Civic, Culture & Sport Categorie

Winners: London Aquatics Centre by Zaha Hadid Architects for Olympic Delivery Authority & London Legacy Development Corporation.

Design Concept

The architectural concept of the London Aquatic Centre is inspired by the fluid geometry of water in motion, creating spaces and a surrounding environment in sympathy with the river landscape of the  Olympic Park. An undulating roof sweeps up from the ground as a wave – enclosing the pools of the Centre with its unifying gesture of fluidity, whilst also describing the volume of the swimming and diving pools.

th_65d1300db123ce22f6e2569fb36764f8_zha_aquaticscentre_huftoncrow_013
The London Aquatic Centre is designed to have the flexibility to accommodate the size and capacity of the London 2012 Olympic Games whilst also providing the optimum size and capacity for use in Legacy mode after the 2012 Games.

Site Context

The London Aquatic Centre is situated within the Olympic Park Masterplan. The site is positioned on the south eastern edge of the Olympic Park with direct proximities to Stratford. The new pedestrian access from the east-west bridge called the Stratford City Bridge which links the Stratford City development with the Olympic Park will cross over the LAC. This will provide a very visible frontage for the LAC along the bridge. Several smaller pedestrian bridges will connect the site to the Olympic Park over the existing canal.

th_65d1300db123ce22f6e2569fb36764f8_zha_aquaticscentre_huftoncrow_015

The Aquatic Centre addresses within its design the main public realm spaces implicit within the Olympic Park and Stratford City planning. These are primarily the east-west connection of the Stratford City Bridge and continuation of the Olympic Park space alongside the canal.

Layout

The Aquatic Centre is planned on an orthogonal axis perpendicular to the Stratford City Bridge. Along this axis are laid out the three pools. The training pool is located under the bridge whilst the
competition and diving pools are within a large volumetric pool hall. The overall strategy is to frame the base of the pool hall as a podium by surrounding it and connecting it into the bridge.

th_65d1300db123ce22f6e2569fb36764f8_zha_aquaticscentre_huftoncrow_007
This podium element allows for the containment of a variety of differentiated and cellular programmatic elements into a single architectural volume which is seen to be completely assimilated with the bridge and the landscape. rom the bridge level the podium emerges from underneath the bridge to cascades around the pool hall to the lower level of the canal side level.

th_65d1300db123ce22f6e2569fb36764f8_zha_aquaticscentre_huftoncrow_004

The pool hall is expressed above the podium level by a large roof which is arching along the same axis as the pools. Its form is generated by the sightlines for the spectators during the Olympic mode.
Double-curvature geometry has been used to create a structure of parabolic arches that create the unique characteristics of the roof.

th_65d1300db123ce22f6e2569fb36764f8_zha_aquaticscentre_huftoncrow_003

The roof undulates to differentiate an internal visual separation inside the pool hall between the competition pool volume and the diving pool volume. The roof projects beyond the base legacy pool hall envelope to extend the roof covering to the external areas of the cascades and the bridge entrance. The roof projection over the bridge entrance announces the London Aquatic Centre’s presence from the approach from either Stratford City or the Olympic Park. Structurally the roof is grounded at 3 primary positions. Otherwise the opening between the roof and the podium is in-filled with a glass façade.

Screen Shot 2014-07-09 at 10.49.30 PM